Web-based training

IBM Enterprise Records 5.1 - System Maintenance - F180G

This course is for the administrator who maintains an IBM Enterprise Records system.

Advanced English
quofox quality seal

463,39 €

incl. 19% VAT

389,40 € (net)

Add to basket

Description

You monitor the IBM Enterprise Records system and the IBM FileNet P8 system with which it runs.

You configure and run the sweep processes, as well as configure and run automatic destruction processes and automatic volume creation. You also configure auditing, export audit logs and retain, archive, and purge metadata.

If you are enrolling in a Self Paced Virtual Classroom or Web Based Training course, before you enroll, please review the Self-Paced Virtual Classes and Web-Based Training Classes on our Terms and Conditions page, as well as the system requirements, to ensure that your system meets the minimum requirements for this course.

http://www.ibm.com/training/terms

Configure multiple profiles of Disposition Sweep
Configure an instance of Hold Sweep
Configure automatic destruction of records
Configure automatic volume creation
Enable and configure auditing
View and export audit logs
Enable metadata retention on the file plan
Export and delete retained metadata from the production system

Aim

Acquire the knowledge and skills necessary to configure and run the sweep processes, configure and run automatic destruction processes, configure automatic volume creation, configure auditing, and retain, archive, and purge metadata.

Participant requirements

You should complete:

IBM FileNet P8 5.0 Prerequisite Skills using Workplace (F140)
IBM Enterprise Records 5.1: Core Skills (F178)
IBM Enterprise Records 5.1: System Configuration (F179)
IBM FileNet P8 Platform 5.0: System Implementation and Administration (F142)

Participant

This course is for anyone who is going to maintain an IBM Enterprise Records system.


You might also be interested in

Report problem


Thanks

for your interest in this product.

We will get in touch with the provider immediately and will offer new dates shortly.
We will inform you about the new dates in 14 days at the latest.

Until then you will find the product in your wish list.